2016 Off Road Workparties |
Building The Bridge At Vedder Mountain
|
Building The Bridge At Vedder Mountain
|
Building The Bridge At Vedder Mountain
|
Cleaning up the Bear Cub Trails for the kids at Chipmunk Creek - drilling rocks.
|
Our power plant with Chris working hard on drilling.
|
President Phil clearing trail.
|
Scooping Up Gravel
|
Barry watches gravel loading.
|
Lots of equipment for this final job.
|
Loading Gravel
|
Rolling And Tamping Down the Gravel
|
Great Looking Trail With New Gravel
|
Great Looking Trail With New Gravel
|
Trails Looking Good
|
Trails Looking Good
|
Good Looking Trail
|
Final day of the 45 yards of gravel being laid out on the Bear Cub Kids Trail at Chipmunk Creek
|
A Load Of Gravel
|
Machine At Work - Barry C. On Duty
|
Chris spreading the gravel.
|
Barry moving gravel.
|
Bringing In The Big Guns
|
Working On The Trail
|
Sign For Bear Cub Beginner Loop Trail
|
Chris and Barry emptying gravel from the trailer.
|
Working On The Trail
|
Trail Needs Gravel
|
Looks better with gravel.
|
Bridging
|
Moving Big Rocks
|
Spreading Gravel
|